TWT ( Thin white
topping ) across the weigh bridge at CTTL.
The
CTTL (Chemical Terminal Trombay Ltd) is
located at Mehul, Chembur. The company is engaged in distribution and servicing
of bulk liquid chemicals and petroleum products and also flyash utilization
activities. Daily average hundred or more tankers of 30-40 ton loading capacity
carrying chemicals are moving out and same numbers empty tankers are coming inside
the terminal The terminal is having storage facility and the chemicals are
transported through tankers to respective destination. The company is committed
to effective management of the natural and workplace environment to be its one
of the highest priorities.
The
existing bituminous road inside CTTL campus is designed as per Indian road
congress.IRC-37.with CBR of sub-grade is considered as 2%.The entire terminal area
is covered by bituminous macadam .The roads are ok except the area near the
weigh bridge. The road is failing
because of the breaking action of the loaded tankers on the road. The
tensile strength of the bituminous road is not enough to counter the strain generated
by the breaking action of the 30 ton tankers.
During
the inspection of the road wet patches were observed below the bituminous
carpet which may cause the damage to the road The damage is causing delay in
operation and there is always a fear of safety hazards.
The
e-cube consultant has recommended TWT (Thin white topping) with high split
tensile strength and high impact resistant values. The e-cube consultant has
designed special concrete mix of M-60 grade with micro silica. Micro silica is
obtained as byproduct of silicone industry. The synthetic polypropylene fibers commonly known as PP fibers are used to improve the structural and impact
resistant properties. The BASF glenium sky 8880 is used. The significance of
this admixture is its functional group poly-carboxyl ether. The dispersion of Cement particle is due to ionic
and stearic hindrance properties.
of admixture
The very
important highlight of this trail is the concrete of M-60 grade with 50% replacement
of cement with VHSC processed flyash of Mundra power plant. The CTTL with
e-cube consultant is first time testing VHSC product. Forty meter cube of concrete
is made using VHSC and used in TWT concrete. This will be the successful
venture of CTTL towards the flyash ut ilization. The success of this trail will
radically change the economics of TATA group of companies but also change the
construction industry at national level.
The
following methodology is used
The
total area of `750 m2 near the weigh bridge is located.
1) It is scarified to remove all the
existing bituminous overlay. The existing bituminous overlay was totally
damaged and there was no difficulty in removing it.
2) The WBM exposed is compacted
using 10 ton static roller. The WBM-III is used for filling the potholes crated
and leveling the top surface
3) 100mm DLC /PCC of M-15 grade is laid on WBM
4) 150mm M-60 grade concrete with pp
fiber is laid on PCC.
5) 150mm M-60 grade concrete with
OPC binder is replaced with VHSC.
6) Cut the PQC one meter by one
meter,
7) Cured for seven days
The
concrete is prepared in RMC pant located near by.
The
road is ready for operation.